1. High-level requirements
-The key rquirements for this project are as follows:
+The key requirements for this project are as follows:
1) The project shall develop a flexible framework for implementing
and running Power-On-Self-Test in U-Boot. This framework shall
This group will contain those tests that do not take much
time and can be run on the regular basis (e.g. CPU test)
- 3) Tests running on in special "slow test more" only
+ 3) Tests running in special "slow test mode" only
This group will contain POST tests that consume much time
and cannot be run regularly (e.g. strong memory test, I2C test)
1) Tests running before relocating to RAM
- These tests will run immediatelly after initializing RAM
+ These tests will run immediately after initializing RAM
as to enable modifying it without taking care of its
contents. Basically, this group will contain memory tests
only.